亚洲午夜视频在线观看|久久综合AV免费观看|av天堂不卡顿在线观看|亚洲伊人22综合开心网|亚洲综合无码av一区二区|一本大道无码日韩精品影视|精品无码成人片一区二区98|少妇一级婬片高潮流水在线观看

About Us
Company Profile Honors and Qualifications Organizational Structure
News Center
Product Center
Alloy copper wire drawing equipment Aluminum wire drawing production equipment Wire drawing annealing production equipment
Marketing Network
Human Resources
Customer Service
Contact Us Online Message
NEWS CENTER

NEWS CENTER

UPDATE COMPANY NEWS AND INDUSTRY NEWS IN REAL TIME

Release time:2024/08/06
Water tank type aluminum wire drawing machine operation and maintenance methods

1. Prepare before starting

1.1 Environment Check

Ensure that the working area is clean and free of debris, so as not to affect the normal operation of the equipment or cause security risks.

Check whether the power supply line is in good condition and the voltage is stable.

Check the level of the cooling system (water tank) to ensure that the coolant is sufficient and clean.

1.2 Device Check

Check whether the parts of the wire drawing machine are tight and not loose.

Check whether the roller and drawing die are installed correctly, without damage or excessive wear.

Verify that the control system (such as PLC) is in normal condition and the display is clear.

1.3 Obtaining Materials

Prepare the aluminum wire to be processed to ensure that its quality meets production requirements.

Check whether the feeding device is ready and adjust the appropriate tension.

2. Procedure

2.1 Starting the Device

Turn on the power switch and start the control system according to the equipment instructions.

Gradually start the various parts of the wire drawing machine, such as the motor, cooling system, etc., and pay attention to the operation status of the equipment.

2.2 Debugging Parameters

According to the production demand, through the control system to set the appropriate drawing speed, tension, coolant flow and other parameters.

Test run, observe the drawing effect, and fine-tune if necessary.

2.3 Formal Production

After confirmation, start the formal production, and check the product quality and equipment operation status regularly.

Record production data for subsequent analysis and improvement.

3. Quality control

Regularly check the diameter, surface finish, mechanical properties and other indicators of wire drawing products to ensure that they meet the standard requirements.

Pay close attention to the abnormal situation in the production process, such as broken wire, mold wear too fast, timely analysis of the cause and take measures to solve.

Periodically calibrate the measuring tool to ensure the accuracy of the test results.

4. Routine maintenance

After the end of production every day, clean the equipment surface and working area of aluminum debris, oil and other debris.

Check the quality and level of the coolant, and replace or replenish the coolant in time.

Clean roller, drawing die and other easily worn parts, remove attachments, and keep them in good working condition.

5. Emergency treatment

In case of equipment failure or safety accident, stop the machine immediately and cut off the power supply.

Handle according to emergency plans, such as using fire extinguishers to extinguish fire, immediately give first aid and report to relevant departments when injured.

Record the accident process and treatment results for subsequent analysis and improvement.

6. Safety precautions

The operator must wear good labor protective equipment, such as safety helmet, protective glasses, work clothes, etc.

Do not perform unnecessary adjustments or maintenance operations while the equipment is running.

Strictly abide by the operating procedures and safety rules, and shall not change the equipment parameters or operating procedures without authorization.

Conduct regular safety education and training for operators to improve their safety awareness and operation skills.

7. Regular maintenance

Develop a detailed maintenance plan, clear maintenance cycle and maintenance content.

Perform regular maintenance of the equipment according to the plan, such as changing lubricants, cleaning filters, checking electrical components, etc.

Focus on maintenance of key parts, such as wire drawing die, roller and other easily worn parts need to be replaced or repaired.

Record the maintenance process and results, establish equipment files, and provide basis for subsequent maintenance and management.

Through the implementation of the above operation and maintenance methods, it can ensure the stable operation and efficient production of the water tank type aluminum wire drawing machine, improve product quality and production efficiency, and reduce production costs and safety risks.


About Us News Center Product Center Marketing Network Human Resources Customer Service
临清市| 无为县| 阿克苏市| 乌苏市| 凤阳县| 湘潭县| 晋城| 卢湾区| 金寨县| 孟津县| 曲阜市| 镇沅| 新昌县| 桐柏县| 蒙阴县| 老河口市| 襄垣县| 栾城县| 泉州市| 金坛市| 都昌县| 进贤县| 和顺县| 丰镇市| 定州市| 北辰区| 郸城县| 禹州市| 隆化县| 虞城县| 洛隆县| 鹤岗市| 宁南县| 陈巴尔虎旗| 嘉祥县| 新闻| 徐汇区| 全南县| 仁化县| 乌兰察布市| 两当县|